The below information has been provided in an effort to help keep the community informed on a more frequent basis about progress at the AltEn site.
Ever since AltEn ceased operations at its facility in Mead in 2021, the AltEn Facility Response Group (FRG) has been voluntarily working under the guidance of the Nebraska Department of Environment and Energy (NDEE) to stabilize the AltEn site and develop a Remedial Action Plan (RAP) for the site. The FRG’s top priorities have been and continue to be to help ensure the safety of the surrounding community and environment. To-date, there has been no evidence of impacts to local drinking water.
The FRG is working diligently with the NDEE to identify the most effective and safest methods to address the current environmental conditions on the AltEn site. The remedial action plans (RAP) will recommend remediation for components remaining on-site, including wastewater, sludge, and wet cake.
MAY 21, 2024
Wet Cake Pilot Project
Odors and Control Measures
With a rise in Springtime temperatures and more site activities, the FRG is planning efforts to mitigate resulting odors.
Air Quality Monitoring
Northeast Lagoon Liner Removal
Southeast Lagoon Dredging
Lagoon Water Treatment and Land Application
Northwest Lagoon Subsoil Sampling Results
Stormwater Best Management Practices
Stay Informed
Check alteninfo.com for the latest updates about AltEn site activities.