AltEn Progress Report

A progress report to update the NDEE on the status of the emergency response measures and interim response at the AltEn site.

AltEn Site Stabilization Activity

Important update on the interim RAP and the FRG’s work to reline the emergency pond, consolidate and install a temporary cover for the wet cake, winterize the plant and piping, and manage the chemical inventory left behind by AltEn.